July 2020 - October 2020
During Covid-19 lockdown all work came to a stop, however once the restrictions were reduced, we managed to get the trades people back, to get the outside cladded, windows and doors in, insulation, electrics and flooring down, its really starting to take shape
During Covid-19 lockdown all work came to a stop, however once the restrictions were reduced, we managed to get the trades people back, to get the outside cladded, windows and doors in, insulation, electrics and flooring down, its really starting to take shape
October 2019
During October 2019 we started building the frame work for the extension, we have also purchased the windows and doors, once the shell is water tight we will be costing up the fixture and fittings, and applying for grants and donations.
During October 2019 we started building the frame work for the extension, we have also purchased the windows and doors, once the shell is water tight we will be costing up the fixture and fittings, and applying for grants and donations.
OCTOBER 2016
The Hall committee has decided to start the build during the first 3 weeks of October. The plan is to build up to floor level, which will improve the fire exit and disabled access into the main hall. This will also act as a small patio until we have sufficient funds to complete the build.
The Hall committee has decided to start the build during the first 3 weeks of October. The plan is to build up to floor level, which will improve the fire exit and disabled access into the main hall. This will also act as a small patio until we have sufficient funds to complete the build.
The New Extension
As the Hall is a big part of the village life, it used by a large range of organisations with in the community, the hall committee felt the hall could do with having more storage and better disabled access. The new extension will be made up of a smaller meeting room and 3 store rooms, a small utility room and improved disabled access.
Planning permission was granted in 2014, more fund raising is needed before any building works can start, we hope for works to start in 2016
Planning permission was granted in 2014, more fund raising is needed before any building works can start, we hope for works to start in 2016